Triple

T7554147
Position Surface form Disambiguated ID Type / Status
Subject Belgrade–Bar railway E178613 entity
Predicate connectsToPort P845 FINISHED
Object Port of Bar E450128 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Port of Bar | Statement: [Belgrade–Bar railway, connectsToPort, Port of Bar]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Port of Bar
Context triple: [Belgrade–Bar railway, connectsToPort, Port of Bar]
  • A. Port of Bar chosen
    The Port of Bar is Montenegro’s main seaport on the Adriatic Sea, serving as a key maritime gateway for the country’s trade and transportation.
  • B. Port of Herceg Novi
    The Port of Herceg Novi is a coastal maritime facility in the Bay of Kotor, Montenegro, serving local passenger, leisure, and small commercial vessels.
  • C. Port of Kotor
    The Port of Kotor is a coastal harbor and cruise ship terminal in the historic town of Kotor, Montenegro, serving as a key maritime gateway for tourism in the Adriatic.
  • D. Port of Tivat
    Port of Tivat is a coastal harbor and marina town in Montenegro, known for its yachting facilities and location along the Adriatic Sea.
  • E. Port of Korčula
    The Port of Korčula is a coastal harbor and maritime transport hub serving the town and island of Korčula in Croatia, handling passenger ferries, local boats, and regional sea traffic.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f2da22c8190a50942ac20af70e8 completed March 27, 2026, 3:15 p.m.
NER Named-entity recognition batch_69c6f8b990148190b26a3a262cf538b3 completed March 27, 2026, 9:38 p.m.
NED1 Entity disambiguation (via context triple) batch_69c84f3602008190aa91cf55e43bdf30 completed March 28, 2026, 9:59 p.m.
Created at: March 27, 2026, 3:49 p.m.