Triple
T755382
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dragon Gate (San Francisco) |
E15542
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | city gate |
C2172
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: city gate Context triple: [Dragon Gate (San Francisco), instanceOf, city gate]
-
A.
triumphal arch
chosen
A triumphal arch is a monumental, freestanding structure with one or more arched passageways, built to commemorate significant victories, events, or individuals.
-
B.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
-
C.
street
A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
-
D.
city
A city is a densely populated, structured urban area characterized by extensive infrastructure, diverse economic activities, and complex social, cultural, and political systems.
-
E.
urban street grid
An urban street grid is a planned network of intersecting streets, typically arranged in a regular, rectangular pattern, that organizes city blocks, guides movement, and shapes land use within an urban area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493599a0081908da65f3407af1ef2 |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:37 p.m.