Triple

T7548898
Position Surface form Disambiguated ID Type / Status
Subject 2026 Commonwealth Games E178477 entity
Predicate originalPlannedOpeningYear P77933 FINISHED
Object 2026 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2026 | Statement: [2026 Commonwealth Games, originalPlannedOpeningYear, 2026]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: originalPlannedOpeningYear
Context triple: [2026 Commonwealth Games, originalPlannedOpeningYear, 2026]
  • A. officialOpeningYear
    Indicates the calendar year in which something was formally opened or inaugurated for official use.
  • B. officialOpeningDate
    Indicates the calendar date on which something is formally inaugurated or officially opened for use or operation.
  • C. originalPlannedLaunchYear
    Indicates the year that was initially scheduled or intended for an entity’s launch before any delays or changes.
  • D. firstPlanStartYear
    Indicates the calendar year in which an entity’s initial plan or planning period begins.
  • E. expansionOpeningDate
    Indicates the date on which an expansion of something (such as a facility, service, or project) was officially opened or became operational.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f2cbe08819088f9eb0c03ef529b completed March 27, 2026, 3:15 p.m.
NER Named-entity recognition batch_69c6f89b9afc8190b3e61a8e2cea7ad7 completed March 27, 2026, 9:37 p.m.
PD Predicate disambiguation batch_69c6f4daad6c8190af2b8ae88d2c8cb7 completed March 27, 2026, 9:21 p.m.
PDg Predicate description generation batch_69c6f8184bb08190b2f70545a6aa277c completed March 27, 2026, 9:35 p.m.
Created at: March 27, 2026, 3:49 p.m.