Triple

T7536923
Position Surface form Disambiguated ID Type / Status
Subject Services of Supply (U.S. Army) E178173 entity
Predicate instanceOf P0 FINISHED
Object logistical command C2381 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: logistical command
Context triple: [Services of Supply (U.S. Army), instanceOf, logistical command]
  • A. logistics command chosen
    Logistics command is the organizational function responsible for planning, coordinating, and controlling the movement, supply, and maintenance of resources to ensure operational readiness and sustained support.
  • B. logistical operation
    A logistical operation is a coordinated set of activities and processes that plan, implement, and control the efficient movement and storage of goods, information, or resources from origin to destination.
  • C. theatre command
    Theatre command is a high-level military headquarters responsible for planning, directing, and coordinating operations across a broad geographic area or theater of war.
  • D. United States military command
    The United States military command is the hierarchical structure of authority and control through which national defense policies and military operations are directed, coordinated, and executed across all branches of the U.S. Armed Forces.
  • E. major command echelon
    A major command echelon is a high-level organizational tier within a military or large institution that oversees multiple subordinate units and directs strategic operations, resources, and policies across a broad mission area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f2acdbc8190b5a8320168c1d0ba completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:48 p.m.