Triple

T7461426
Position Surface form Disambiguated ID Type / Status
Subject Congressional Oversight Panel E176257 entity
Predicate instanceOf P0 FINISHED
Object temporary federal agency C7388 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: temporary federal agency
Context triple: [Congressional Oversight Panel, instanceOf, temporary federal agency]
  • A. ad hoc governmental body chosen
    An ad hoc governmental body is a temporary, specially formed public entity created by a government to address a specific issue, task, or crisis and dissolved once its purpose is fulfilled.
  • B. independent agency of the United States federal government
    An independent agency of the United States federal government is an organization established by Congress that operates outside the executive departments, with a specific mandate and varying degrees of autonomy from presidential control.
  • C. former federal agency of the United States
    A former federal agency of the United States is a government organization that once operated under federal authority but has since been dissolved, merged, or reorganized and no longer exists in its original form.
  • D. temporary structure
    A temporary structure is a short-term physical construction erected for a limited duration to serve a specific, often transitional, purpose before being removed or replaced.
  • E. federation of government agencies
    A federation of government agencies is a collaborative structure in which multiple semi-autonomous public organizations coordinate policies, resources, and operations to achieve shared governmental objectives while retaining their individual mandates.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f21632481908bf83f6c6da897e3 completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:38 p.m.