Triple

T7459577
Position Surface form Disambiguated ID Type / Status
Subject Santa Laura works E176209 entity
Predicate instanceOf P0 FINISHED
Object nitrate processing plant C4822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nitrate processing plant
Context triple: [Santa Laura works, instanceOf, nitrate processing plant]
  • A. industrial plant chosen
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • B. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • C. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • D. wastewater treatment facility
    A wastewater treatment facility is an engineered system that collects, treats, and purifies sewage and industrial effluent to remove contaminants before safely returning the water to the environment or reusing it.
  • E. radioactive waste processing facility
    A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f21632481908bf83f6c6da897e3 completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:37 p.m.