Triple
T7448688
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kjelsås |
E171949
|
entity |
| Predicate | servedBy |
P82
|
FINISHED |
| Object | Oslo Tramway line 12 |
E690884
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oslo Tramway line 12 | Statement: [Kjelsås, servedBy, Oslo Tramway line 12]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Oslo Tramway line 12 Context triple: [Kjelsås, servedBy, Oslo Tramway line 12]
-
A.
Oslo Tram line 12
chosen
Oslo Tram line 12 is a public tram route in Oslo, Norway, that connects central parts of the city with northern residential districts including Nordre Aker.
-
B.
Oslo Tramway line 18
Oslo Tramway line 18 is a light rail route in Oslo’s tram network that connects central parts of the city with the southeastern suburb of Ljabru.
-
C.
Oslo Tramway line 19
Oslo Tramway line 19 is a light rail route in Oslo’s tram network that connects central parts of the city with the southeastern suburb of Ljabru.
-
D.
Oslo Tram line 11
Oslo Tram line 11 is a public tram route in Oslo, Norway, that runs through several city districts including Nordre Aker as part of the city’s urban transit network.
-
E.
Oslo Tram line 13
Oslo Tram line 13 is a key route in the Oslo Tramway network, connecting central Oslo with northern residential districts including the borough of Nordre Aker.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a65402881908f7869368eb746fb |
completed | March 27, 2026, 1:47 p.m. |
| NER | Named-entity recognition | batch_69c6f389ddd48190a4b8753c67220c4f |
completed | March 27, 2026, 9:15 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c9f798cbfc8190b1106298c3f211a5 |
completed | March 30, 2026, 4:10 a.m. |
Created at: March 27, 2026, 3:14 p.m.