Triple

T7448142
Position Surface form Disambiguated ID Type / Status
Subject Little Truckee River E171934 entity
Predicate hasDam P8736 FINISHED
Object Boca Dam E138549 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boca Dam | Statement: [Little Truckee River, hasDam, Boca Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boca Dam
Context triple: [Little Truckee River, hasDam, Boca Dam]
  • A. Boca Dam chosen
    Boca Dam is an earthfill dam in Nevada County, California, that creates Boca Reservoir on the Little Truckee River for water storage, flood control, and recreation.
  • B. Barker Dam
    Barker Dam is a historic water reservoir and popular scenic spot located within Joshua Tree National Park in California.
  • C. Belver Dam
    Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
  • D. Fontana Dam
    Fontana Dam is a large hydroelectric dam in western North Carolina that impounds the Little Tennessee River to form Fontana Lake and provides power, flood control, and recreational opportunities in the surrounding Great Smoky Mountains region.
  • E. Wyman Dam
    Wyman Dam is a hydroelectric dam in Maine that impounds the Kennebec River to form Wyman Lake and generate power.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a65402881908f7869368eb746fb completed March 27, 2026, 1:47 p.m.
NER Named-entity recognition batch_69c6f38808fc8190b27a2b455155cb5b completed March 27, 2026, 9:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69c827abf3288190b146522af7fcfaa1 completed March 28, 2026, 7:10 p.m.
Created at: March 27, 2026, 3:14 p.m.