Triple
T7439435
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Roosevelt Dam |
E171706
|
entity |
| Predicate | associatedWithProject |
P922
|
FINISHED |
| Object | Salt River irrigation project |
E349028
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Salt River irrigation project | Statement: [Roosevelt Dam, associatedWithProject, Salt River irrigation project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Salt River irrigation project Context triple: [Roosevelt Dam, associatedWithProject, Salt River irrigation project]
-
A.
Salt River Project
chosen
Salt River Project is a major public utility in Arizona that provides electricity and water to the Phoenix metropolitan area through a combination of power generation, transmission, and irrigation services.
-
B.
Yaqui Valley irrigation system
The Yaqui Valley irrigation system is a large-scale agricultural water management network in Sonora, Mexico, that transformed the region into a highly productive center for irrigated farming, especially wheat.
-
C.
Rio Salado Project
The Rio Salado Project is an urban revitalization and environmental restoration initiative along the Salt River in the Phoenix metropolitan area, transforming the dry riverbed into recreational, cultural, and economic amenities such as lakes, parks, and trails.
-
D.
Newlands Reclamation Project
The Newlands Reclamation Project is one of the earliest U.S. federal irrigation projects, designed to divert water from the Truckee and Carson Rivers to transform arid Nevada lands into productive agricultural areas.
-
E.
Central Arizona Project
The Central Arizona Project is a major aqueduct system that transports Colorado River water hundreds of miles to supply cities, industries, and agriculture in central and southern Arizona.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a64228c8190affaec2a8127ce7b |
completed | March 27, 2026, 1:47 p.m. |
| NER | Named-entity recognition | batch_69c6f34c28648190a426b5d7623b41e8 |
completed | March 27, 2026, 9:14 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c83c54c5ec8190bc2adf5a19fdea1c |
completed | March 28, 2026, 8:38 p.m. |
Created at: March 27, 2026, 3:13 p.m.