Triple
T7435197
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IL 53 |
E171594
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | Illinois Route 64 |
E187262
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Illinois Route 64 | Statement: [IL 53, connectsTo, Illinois Route 64]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Illinois Route 64 Context triple: [IL 53, connectsTo, Illinois Route 64]
-
A.
Illinois Route 64
chosen
Illinois Route 64 is an east–west state highway in northern Illinois that runs through the Chicago metropolitan area and serves communities such as Maywood.
-
B.
Illinois Route 68
Illinois Route 68 is an east–west state highway in northeastern Illinois that serves suburban communities northwest of Chicago.
-
C.
Illinois Route 56
Illinois Route 56 is a state highway in northeastern Illinois that connects the western suburbs of Chicago, including areas like Downers Grove, to communities farther west.
-
D.
Illinois Route 57
Illinois Route 57 is a north–south state highway in western Illinois that connects Quincy to Interstate 72 and other regional routes.
-
E.
Illinois Route 76
Illinois Route 76 is a north–south state highway in northern Illinois that serves as a primary route through Boone County.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a64228c8190affaec2a8127ce7b |
completed | March 27, 2026, 1:47 p.m. |
| NER | Named-entity recognition | batch_69c6f328cf6081908bea065639fd3620 |
completed | March 27, 2026, 9:14 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c8f2ffec108190ab60b0777d97dd89 |
completed | March 29, 2026, 9:38 a.m. |
Created at: March 27, 2026, 3:13 p.m.