Triple

T7434358
Position Surface form Disambiguated ID Type / Status
Subject Linlithgow Canal Basin E171572 entity
Predicate instanceOf P0 FINISHED
Object canal basin C22224 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: canal basin
Context triple: [Linlithgow Canal Basin, instanceOf, canal basin]
  • A. Panama Canal infrastructure
    Panama Canal infrastructure encompasses the system of locks, channels, dams, ports, support facilities, and control technologies that enable the transit, management, and maintenance of maritime traffic through the Panama Canal.
  • B. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • C. canal
    A canal is a man-made waterway constructed to facilitate transportation, irrigation, drainage, or water management between different locations.
  • D. canal wharf
    A canal wharf is a designated waterside area along a canal where boats can moor to load and unload cargo or passengers.
  • E. canal bridge
    A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a63491881909281f73d4d5643bf completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:13 p.m.