Triple

T7413759
Position Surface form Disambiguated ID Type / Status
Subject Purple Line Express E171075 entity
Predicate connectsWith P37 FINISHED
Object Orange Line E12021 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Orange Line | Statement: [Purple Line Express, connectsWith, Orange Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Orange Line
Context triple: [Purple Line Express, connectsWith, Orange Line]
  • A. Orange Line chosen
    The Orange Line is one of the primary rapid transit routes in the Washington Metro system, running east–west through Washington, D.C. and its Virginia and Maryland suburbs.
  • B. Orange Line
    The Orange Line is a rapid transit route in Chicago that connects the city's Loop with Midway International Airport as part of the Chicago "L" system.
  • C. Orange Line
    The Orange Line is a major corridor of the Delhi Metro system that connects central Delhi to the Indira Gandhi International Airport and surrounding areas.
  • D. Orange Line
    The Orange Line is a light rail route in the Dallas Area Rapid Transit (DART) system serving key destinations including Dallas/Fort Worth International Airport and several northern suburbs.
  • E. Orange Line
    The Orange Line is a planned corridor of Bengaluru’s Namma Metro system intended to expand rapid transit connectivity across additional parts of the city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a618bdc81908d8018edadecd1a4 completed March 27, 2026, 1:47 p.m.
NER Named-entity recognition batch_69c6f2c336308190932c14cec5eec25f completed March 27, 2026, 9:12 p.m.
NED1 Entity disambiguation (via context triple) batch_69c845ecfe988190a981924f5ef49c83 completed March 28, 2026, 9:19 p.m.
Created at: March 27, 2026, 3:11 p.m.