Triple

T7370911
Position Surface form Disambiguated ID Type / Status
Subject High Rock Lake E169998 entity
Predicate partOf P40 FINISHED
Object Yadkin Project
The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
E660377 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Yadkin Project | Statement: [High Rock Lake, partOf, Yadkin Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Yadkin Project
Context triple: [High Rock Lake, partOf, Yadkin Project]
  • A. Yakima Project
    The Yakima Project is a major federal water management and irrigation system in central Washington State that supplies water for agriculture, municipalities, and fish and wildlife habitat.
  • B. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • C. Nolin River Lake project
    The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
  • D. Newlands Reclamation Project
    The Newlands Reclamation Project is one of the earliest U.S. federal irrigation projects, designed to divert water from the Truckee and Carson Rivers to transform arid Nevada lands into productive agricultural areas.
  • E. Fryingpan–Arkansas Project
    The Fryingpan–Arkansas Project is a major U.S. water diversion and storage system in Colorado that transfers water from the Western Slope to the Arkansas River Basin for irrigation, municipal use, and hydroelectric power.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Yadkin Project
Triple: [High Rock Lake, partOf, Yadkin Project]
Generated description
The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Yadkin Project
Target entity description: The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
  • A. Yakima Project
    The Yakima Project is a major federal water management and irrigation system in central Washington State that supplies water for agriculture, municipalities, and fish and wildlife habitat.
  • B. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • C. Nolin River Lake project
    The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
  • D. Newlands Reclamation Project
    The Newlands Reclamation Project is one of the earliest U.S. federal irrigation projects, designed to divert water from the Truckee and Carson Rivers to transform arid Nevada lands into productive agricultural areas.
  • E. Fryingpan–Arkansas Project
    The Fryingpan–Arkansas Project is a major U.S. water diversion and storage system in Colorado that transfers water from the Western Slope to the Arkansas River Basin for irrigation, municipal use, and hydroelectric power.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a5bfaac81909ce7f001dfb70c76 completed March 27, 2026, 1:47 p.m.
NER Named-entity recognition batch_69c6f182df5c81908964fbaa3f8ec790 completed March 27, 2026, 9:07 p.m.
NED1 Entity disambiguation (via context triple) batch_69c802c711788190806987567dbc9942 completed March 28, 2026, 4:33 p.m.
NEDg Description generation batch_69c8035151a481908a33c1ecd12c2f6d completed March 28, 2026, 4:35 p.m.
NED2 Entity disambiguation (via description) batch_69c803aea0808190a5208c02a0db1187 completed March 28, 2026, 4:37 p.m.
Created at: March 27, 2026, 3:07 p.m.