Triple
T7358541
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Indonesian archipelagic sea lanes |
E169687
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sea lane system |
C2569
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sea lane system Context triple: [Indonesian archipelagic sea lanes, instanceOf, sea lane system]
-
A.
sea route
chosen
A sea route is a navigable path across seas or oceans used by ships to travel between ports for trade, transport, or exploration.
-
B.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
C.
navigable waterway
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
D.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
E.
seaport
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a59f2288190877ca15c19b1e822 |
completed | March 27, 2026, 1:47 p.m. |
Created at: March 27, 2026, 3:06 p.m.