Triple

T7337497
Position Surface form Disambiguated ID Type / Status
Subject Trieste city bus network E169165 entity
Predicate instanceOf P0 FINISHED
Object urban public transport network C911 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban public transport network
Context triple: [Trieste city bus network, instanceOf, urban public transport network]
  • A. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • B. public transit system chosen
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • C. city network
    A city network is an interconnected system of urban areas linked by transportation, communication, and economic relationships that facilitate the flow of people, goods, information, and services.
  • D. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • E. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a568a6481908f11e20db7bc8446 completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:04 p.m.