Triple

T7322453
Position Surface form Disambiguated ID Type / Status
Subject Gateshead Millennium Bridge E168784 entity
Predicate instanceOf P0 FINISHED
Object tilting bridge C4026 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tilting bridge
Context triple: [Gateshead Millennium Bridge, instanceOf, tilting bridge]
  • A. movable bridge chosen
    A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
  • B. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • C. tram bridge
    A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
  • D. cantilever bridge
    A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
  • E. vertical-lift bridge
    A vertical-lift bridge is a movable bridge whose central span rises vertically between two towers to allow river or maritime traffic to pass beneath while maintaining a level roadway.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a54cacc81908e3b773441f19566 completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:03 p.m.