Triple
T7312012
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gleason Works |
E168112
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | machine tool manufacturer |
C136
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: machine tool manufacturer Context triple: [Gleason Works, instanceOf, machine tool manufacturer]
-
A.
manufacturing company
chosen
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
B.
machinist
A machinist is a skilled tradesperson who sets up, operates, and maintains machine tools to manufacture precision metal or plastic parts according to technical specifications.
-
C.
musical instrument maker
A musical instrument maker is a craftsperson who designs, constructs, and often repairs musical instruments, combining technical skill with acoustic and artistic understanding.
-
D.
machine
A machine is a man-made device or system that uses energy to perform work, automate tasks, or process materials according to designed functions.
-
E.
industrial automation company
An industrial automation company designs, develops, and implements control systems, robotics, and software solutions to optimize and automate manufacturing and industrial processes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6888d8e3c81909db79714903baf31 |
completed | March 27, 2026, 1:39 p.m. |
Created at: March 27, 2026, 3:02 p.m.