Triple

T730453
Position Surface form Disambiguated ID Type / Status
Subject Warrington E14818 entity
Predicate crossedBy P416 FINISHED
Object M56 motorway E8496 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M56 motorway | Statement: [Warrington, crossedBy, M56 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M56 motorway
Context triple: [Warrington, crossedBy, M56 motorway]
  • A. M56 motorway chosen
    The M56 motorway is a major road in North West England that connects Manchester to North Wales and serves as a key route to Manchester Airport.
  • B. M58 motorway
    The M58 motorway is a key road in North West England that links the M6 near Wigan to the Liverpool area, providing an important route across Merseyside and Lancashire.
  • C. M80 motorway
    The M80 motorway is a major road in Scotland connecting Glasgow to Stirling and forming part of the primary route between central Scotland and the north.
  • D. M57 motorway
    The M57 motorway is a major orbital route in North West England that serves as a bypass around Liverpool, connecting several key motorways and facilitating regional traffic flow.
  • E. M77 motorway
    The M77 motorway is a major road in Scotland that links Glasgow to Kilmarnock and the southwest, forming part of a key route toward Ayrshire.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4934d9930819099eed80096b0597d completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a5c290e481908497430a05dbfb90 completed March 1, 2026, 8:46 p.m.
NED1 Entity disambiguation (via context triple) batch_69addf0e902881909690c8c80abfa8c0 completed March 8, 2026, 8:41 p.m.
Created at: March 1, 2026, 7:37 p.m.