Triple

T7291774
Position Surface form Disambiguated ID Type / Status
Subject Reunion Boulevard (Dallas) E164413 entity
Predicate connectsTo P845 FINISHED
Object Interstate 35E E16581 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 35E | Statement: [Reunion Boulevard (Dallas), connectsTo, Interstate 35E]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 35E
Context triple: [Reunion Boulevard (Dallas), connectsTo, Interstate 35E]
  • A. Interstate 35E chosen
    Interstate 35E is the eastern branch of Interstate 35 that runs through Dallas, Texas, serving as a key north–south transportation corridor in the region.
  • B. Interstate 35E
    Interstate 35E is a major north–south U.S. Interstate Highway that runs through Saint Paul, Minnesota, as part of the split of Interstate 35 in the Twin Cities metropolitan area.
  • C. Interstate 35
    Interstate 35 is a major north–south U.S. highway running from the Mexican border in Texas through the central United States to Minnesota, serving numerous key cities along its route.
  • D. Interstate 355
    Interstate 355 is a toll highway in the Chicago metropolitan area that serves as a suburban north–south bypass around the city.
  • E. Interstate 29
    Interstate 29 is a major north–south U.S. highway running through the Great Plains from Missouri to North Dakota, connecting cities such as Kansas City, Sioux City, and Fargo.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6887a499881909dd23341399c59d8 completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6eb6e8f3881908628b3d41aad70c6 completed March 27, 2026, 8:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69f49c59538081909102a6954f564e46 completed May 1, 2026, 12:28 p.m.
Created at: March 27, 2026, 3 p.m.