Triple

T7271018
Position Surface form Disambiguated ID Type / Status
Subject Weiss Lake E161102 entity
Predicate createdBy P806 FINISHED
Object Weiss Dam
Weiss Dam is a hydroelectric dam on the Coosa River in northeastern Alabama that impounds Weiss Lake for power generation, flood control, and recreation.
E686354 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Weiss Dam | Statement: [Weiss Lake, createdBy, Weiss Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Weiss Dam
Context triple: [Weiss Lake, createdBy, Weiss Dam]
  • A. Merwin Dam
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • B. Keechelus Dam
    Keechelus Dam is an earthfill dam in Washington State that forms Keechelus Lake, providing water storage and regulation as part of the U.S. Bureau of Reclamation’s Yakima irrigation system.
  • C. McClure Dam
    McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
  • D. Belver Dam
    Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
  • E. Gerber Dam
    Gerber Dam is an irrigation and water storage dam in southern Oregon that helps regulate water supply for agriculture and flood control within the Klamath Basin.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Weiss Dam
Triple: [Weiss Lake, createdBy, Weiss Dam]
Generated description
Weiss Dam is a hydroelectric dam on the Coosa River in northeastern Alabama that impounds Weiss Lake for power generation, flood control, and recreation.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Weiss Dam
Target entity description: Weiss Dam is a hydroelectric dam on the Coosa River in northeastern Alabama that impounds Weiss Lake for power generation, flood control, and recreation.
  • A. Merwin Dam
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • B. Keechelus Dam
    Keechelus Dam is an earthfill dam in Washington State that forms Keechelus Lake, providing water storage and regulation as part of the U.S. Bureau of Reclamation’s Yakima irrigation system.
  • C. McClure Dam
    McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
  • D. Belver Dam
    Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
  • E. Gerber Dam
    Gerber Dam is an irrigation and water storage dam in southern Oregon that helps regulate water supply for agriculture and flood control within the Klamath Basin.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885181008190b419040e22939c7c completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6eb088dac8190b353f6ea3d686025 completed March 27, 2026, 8:39 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8be10c5b081908210981ce9c45bd9 completed March 29, 2026, 5:52 a.m.
NEDg Description generation batch_69c8bface14c8190a78d7ed43316bffd completed March 29, 2026, 5:59 a.m.
NED2 Entity disambiguation (via description) batch_69c8c02e7a548190b2c5ad84e4c3f1fb completed March 29, 2026, 6:01 a.m.
Created at: March 27, 2026, 2:58 p.m.