Triple
T726790
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | He Zizhen |
E14743
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | participant in the Long March |
C3668
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: participant in the Long March Context triple: [He Zizhen, instanceOf, participant in the Long March]
-
A.
work by Mao Zedong
A "work by Mao Zedong" is any written, spoken, or otherwise recorded piece of political, philosophical, or military thought authored or co-authored by Mao Zedong.
-
B.
campaign of the Russian Civil War
A campaign of the Russian Civil War is a coordinated series of military operations conducted by opposing factions over a specific region and period, aimed at achieving strategic political and territorial objectives within the broader conflict.
-
C.
guerrilla leader
chosen
A guerrilla leader is a commander who organizes, directs, and motivates small, irregular combat groups to conduct unconventional warfare, often using hit-and-run tactics and local support against a typically stronger adversary.
-
D.
World War II resistance member
A World War II resistance member is an individual who clandestinely opposed Axis occupation or authoritarian regimes through activities such as sabotage, intelligence gathering, underground communication, and support for persecuted populations.
-
E.
event in the Second Sino-Japanese War
An event in the Second Sino-Japanese War is a specific historical occurrence—such as a battle, campaign, political decision, or diplomatic incident—that took place between 1937 and 1945 within the broader conflict between China and Japan.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4934c753c81909b309027e48b9b3a |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:37 p.m.