Triple

T7238389
Position Surface form Disambiguated ID Type / Status
Subject Interstate 4 E155290 entity
Predicate abbreviation P43 FINISHED
Object I-4
I-4 is a major east–west Interstate Highway in Florida that connects Tampa, Orlando, and Daytona Beach.
E650749 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-4 | Statement: [Interstate 4, abbreviation, I-4]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-4
Context triple: [Interstate 4, abbreviation, I-4]
  • A. I-405
    I-405 is a major auxiliary Interstate Highway that serves as a heavily traveled bypass and commuter route around parts of the greater Los Angeles and Seattle metropolitan areas.
  • B. I-8
    I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
  • C. I-335
    I-335 is a segment of the Kansas Turnpike that forms part of the Interstate Highway System, connecting Emporia and Topeka in eastern Kansas.
  • D. I-235
    I-235 is an auxiliary Interstate Highway that serves as a bypass route around Wichita, Kansas.
  • E. I-375
    I-375 is a short auxiliary Interstate Highway in downtown Detroit, Michigan, connecting I-75 to the city's central business district and riverfront.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: I-4
Triple: [Interstate 4, abbreviation, I-4]
Generated description
I-4 is a major east–west Interstate Highway in Florida that connects Tampa, Orlando, and Daytona Beach.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: I-4
Target entity description: I-4 is a major east–west Interstate Highway in Florida that connects Tampa, Orlando, and Daytona Beach.
  • A. I-405
    I-405 is a major auxiliary Interstate Highway that serves as a heavily traveled bypass and commuter route around parts of the greater Los Angeles and Seattle metropolitan areas.
  • B. I-8
    I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
  • C. I-335
    I-335 is a segment of the Kansas Turnpike that forms part of the Interstate Highway System, connecting Emporia and Topeka in eastern Kansas.
  • D. I-235
    I-235 is an auxiliary Interstate Highway that serves as a bypass route around Wichita, Kansas.
  • E. I-375
    I-375 is a short auxiliary Interstate Highway in downtown Detroit, Michigan, connecting I-75 to the city's central business district and riverfront.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c688143bfc81908d4176617735e601 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6ea368fb88190bd9e991e8b94dac6 completed March 27, 2026, 8:36 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7cc381a4081909a8ea7ee02348328 completed March 28, 2026, 12:40 p.m.
NEDg Description generation batch_69c7cda71c088190afe117d8d3ff04ab completed March 28, 2026, 12:46 p.m.
NED2 Entity disambiguation (via description) batch_69c7ce1b5e0081908d8e68fb1c0bfd3e completed March 28, 2026, 12:48 p.m.
Created at: March 27, 2026, 2:55 p.m.