Triple

T7223294
Position Surface form Disambiguated ID Type / Status
Subject Macon Area Transportation Study MPO E150313 entity
Predicate instanceOf P0 FINISHED
Object Metropolitan planning organization C1090 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Metropolitan planning organization
Context triple: [Macon Area Transportation Study MPO, instanceOf, Metropolitan planning organization]
  • A. regional planning agency chosen
    A regional planning agency is an organization responsible for coordinating land use, transportation, infrastructure, and environmental planning across multiple jurisdictions within a defined geographic region.
  • B. metropolitan authority
    A metropolitan authority is a governing body responsible for planning, coordinating, and managing public services and development across a large urban area and its surrounding municipalities.
  • C. Mayoral development corporation
    A mayoral development corporation is a public body established by a city’s mayor to lead and coordinate regeneration, planning, and economic development within a designated urban area.
  • D. regional planning program
    A regional planning program is an organized framework of policies, strategies, and actions designed to guide the coordinated development, land use, infrastructure, and resource management of a specific geographic area over time.
  • E. Micropolitan Statistical Area
    A Micropolitan Statistical Area is a geographic region defined by the U.S. Office of Management and Budget centered around an urban core with a population between 10,000 and 49,999, plus adjacent territories with strong social and economic integration.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687effb44819092b95d07d0368c9f completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 2:54 p.m.