Triple

T721656
Position Surface form Disambiguated ID Type / Status
Subject Ledo Road E14629 entity
Predicate instanceOf P0 FINISHED
Object World War II infrastructure project C702 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: World War II infrastructure project
Context triple: [Ledo Road, instanceOf, World War II infrastructure project]
  • A. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • B. World War II site chosen
    A World War II site is a historically significant location directly associated with events, operations, or impacts of the Second World War, preserved or recognized for its cultural, military, or memorial value.
  • C. World War II-era agency
    A World War II-era agency is an organization, typically governmental or intergovernmental, established during the Second World War to coordinate military, economic, intelligence, or civilian efforts in support of the war.
  • D. World War II weapon
    A World War II weapon is any tool, device, or system—ranging from small arms and artillery to aircraft, naval vessels, and emerging technologies like rockets and atomic bombs—designed and employed by nations between 1939 and 1945 to inflict damage, gain strategic advantage, or defend against enemy forces.
  • E. post–World War II reconstruction program
    A post–World War II reconstruction program is a coordinated set of policies, financial aid, and institutional reforms designed to rebuild war-torn economies, infrastructure, and governance structures while promoting long-term stability and growth.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4934c753c81909b309027e48b9b3a completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:37 p.m.