Triple
T721656
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ledo Road |
E14629
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | World War II infrastructure project |
C702
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: World War II infrastructure project Context triple: [Ledo Road, instanceOf, World War II infrastructure project]
-
A.
World War II project
A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
-
B.
World War II site
chosen
A World War II site is a historically significant location directly associated with events, operations, or impacts of the Second World War, preserved or recognized for its cultural, military, or memorial value.
-
C.
World War II-era agency
A World War II-era agency is an organization, typically governmental or intergovernmental, established during the Second World War to coordinate military, economic, intelligence, or civilian efforts in support of the war.
-
D.
World War II weapon
A World War II weapon is any tool, device, or system—ranging from small arms and artillery to aircraft, naval vessels, and emerging technologies like rockets and atomic bombs—designed and employed by nations between 1939 and 1945 to inflict damage, gain strategic advantage, or defend against enemy forces.
-
E.
post–World War II reconstruction program
A post–World War II reconstruction program is a coordinated set of policies, financial aid, and institutional reforms designed to rebuild war-torn economies, infrastructure, and governance structures while promoting long-term stability and growth.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4934c753c81909b309027e48b9b3a |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:37 p.m.