Triple

T720320
Position Surface form Disambiguated ID Type / Status
Subject Massachusetts Water Resources Authority E14601 entity
Predicate instanceOf P0 FINISHED
Object sewer utility C4509 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sewer utility
Context triple: [Massachusetts Water Resources Authority, instanceOf, sewer utility]
  • A. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • B. water supply system
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • C. drinking water infrastructure
    Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
  • D. natural gas utility
    A natural gas utility is a regulated service provider that supplies, transports, and distributes natural gas to residential, commercial, and industrial customers through an integrated pipeline infrastructure.
  • E. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4934c753c81909b309027e48b9b3a completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:37 p.m.