Triple
T7202969
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North Luzon Expressway |
E148593
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | expressway in the Philippines |
C3788
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: expressway in the Philippines Context triple: [North Luzon Expressway, instanceOf, expressway in the Philippines]
-
A.
highway
A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
-
B.
motorway
chosen
A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
-
C.
bridge in the Philippines
A bridge in the Philippines is a man-made structure that spans physical obstacles such as bodies of water, valleys, or roads within the Philippine archipelago to facilitate transportation and connectivity between different areas.
-
D.
highway system
A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
-
E.
toll road
A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687e8cf188190b5f3ecffd681f04e |
completed | March 27, 2026, 1:36 p.m. |
Created at: March 27, 2026, 2:52 p.m.