Triple

T7188774
Position Surface form Disambiguated ID Type / Status
Subject CGPM resolutions E167634 entity
Predicate instanceOf P0 FINISHED
Object metrology standardization document C2034 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metrology standardization document
Context triple: [CGPM resolutions, instanceOf, metrology standardization document]
  • A. standards-related document chosen
    A standards-related document is an authoritative publication that defines, explains, or supports the development, implementation, or interpretation of technical or organizational standards.
  • B. national measurement standards laboratory
    A national measurement standards laboratory is an official institution responsible for developing, maintaining, and disseminating a country’s primary measurement standards to ensure accuracy, consistency, and international compatibility of measurements.
  • C. military standard
    A military standard is an officially established set of technical, procedural, or quality requirements used by armed forces to ensure compatibility, reliability, and uniformity of equipment, systems, and practices.
  • D. metadata standard
    A metadata standard is a structured set of rules and definitions that specify how information about resources should be described, formatted, and shared to ensure consistency, interoperability, and discoverability.
  • E. IEC system for conformity testing and certification
    An IEC system for conformity testing and certification is a standardized framework that defines procedures, criteria, and accreditation mechanisms to verify and certify that products, services, or systems comply with relevant IEC international standards.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6888b5248819090499a884ee3ec39 completed March 27, 2026, 1:39 p.m.
Created at: March 27, 2026, 2:50 p.m.