Triple
T7183025
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Spokane River |
E167496
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Monroe Street Dam |
E509498
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Monroe Street Dam | Statement: [Spokane River, hasDam, Monroe Street Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Monroe Street Dam Context triple: [Spokane River, hasDam, Monroe Street Dam]
-
A.
Monroe Street Dam
chosen
Monroe Street Dam is a historic hydroelectric dam on the Spokane River in downtown Spokane, Washington, known for harnessing Spokane Falls to generate power.
-
B.
Harris Station Dam
Harris Station Dam is a large hydroelectric dam in Maine that forms Indian Pond and serves as a major power-generating facility on the Kennebec River.
-
C.
River Mill Dam
River Mill Dam is a hydroelectric dam on the Clackamas River in Oregon, known for power generation and its role in regional water management.
-
D.
Macomb’s Dam
Macomb’s Dam was a historic Harlem River crossing in New York City that preceded and was ultimately superseded by the Macombs Dam Bridge.
-
E.
Shawmut Dam
Shawmut Dam is a hydroelectric dam located on Maine’s Kennebec River, used for power generation and river flow management.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6888a7c548190a3d39b52a393080f |
completed | March 27, 2026, 1:39 p.m. |
| NER | Named-entity recognition | batch_69c6e8bd52648190a22412300254e5d4 |
completed | March 27, 2026, 8:29 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c83c4097d88190b00a8c64ce6871e5 |
completed | March 28, 2026, 8:38 p.m. |
Created at: March 27, 2026, 2:49 p.m.