Triple

T7182814
Position Surface form Disambiguated ID Type / Status
Subject Savoy, Illinois E167490 entity
Predicate transportation P230 FINISHED
Object U.S. Route 45 E220306 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 45 | Statement: [Savoy, Illinois, transportation, U.S. Route 45]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 45
Context triple: [Savoy, Illinois, transportation, U.S. Route 45]
  • A. U.S. Route 45 chosen
    U.S. Route 45 is a major north–south United States highway that runs from the Gulf Coast in Mississippi through several Midwestern states to the Upper Peninsula of Michigan.
  • B. U.S. Route 75
    U.S. Route 75 is a major north–south U.S. Highway running from Texas through the central United States, serving as a key transportation corridor for cities such as Dallas.
  • C. U.S. Route 59
    U.S. Route 59 is a north–south United States highway that runs from the Mexico–U.S. border in Texas to the Canada–U.S. border in Minnesota, passing through several central states.
  • D. U.S. Route 77
    U.S. Route 77 is a major north–south U.S. Highway running from the Mexican border in Texas through several central states to its northern terminus in Iowa.
  • E. U.S. Route 181
    U.S. Route 181 is a U.S. Highway in southern Texas that runs north from Corpus Christi, serving as a key regional connector through several coastal and inland communities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6888a7c548190a3d39b52a393080f completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6e8bd52648190a22412300254e5d4 completed March 27, 2026, 8:29 p.m.
NED1 Entity disambiguation (via context triple) batch_69c98564d32881908ebdeb2aa41da4f7 completed March 29, 2026, 8:02 p.m.
Created at: March 27, 2026, 2:49 p.m.