Triple

T7175697
Position Surface form Disambiguated ID Type / Status
Subject Istanbul Metro E167312 entity
Predicate connectsTo P845 FINISHED
Object Istanbul Tram E643798 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Istanbul Tram | Statement: [Istanbul Metro, connectsTo, Istanbul Tram]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Istanbul Tram
Context triple: [Istanbul Metro, connectsTo, Istanbul Tram]
  • A. Istanbul tram network chosen
    The Istanbul tram network is a modern urban rail system that forms a key part of the city’s public transport, linking major districts on the European side and connecting seamlessly with metro, bus, and ferry services.
  • B. Tram Izmir
    Tram Izmir is a modern light rail tram network serving the Turkish city of İzmir as part of its urban public transportation system.
  • C. Istanbul Metro
    The Istanbul Metro is a rapid transit system serving Istanbul, Turkey, connecting key districts and transport hubs across the city.
  • D. Istanbul commuter rail network
    The Istanbul commuter rail network is a suburban rail system serving the greater Istanbul metropolitan area, integrating cross-Bosporus links and multiple lines to connect key residential and commercial districts.
  • E. Ankara Metro
    Ankara Metro is the rapid transit system serving Turkey's capital city, providing urban rail transportation across Ankara and its surrounding districts.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68889a2748190a316c5e65360361a completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6e88ec6a8819083cbc3f4c39b8c79 completed March 27, 2026, 8:29 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7bf8a5d7c8190a7b52d46529dacb7 completed March 28, 2026, 11:46 a.m.
Created at: March 27, 2026, 2:48 p.m.