Triple
T71552
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | California–Nevada border |
E1431
|
entity |
| Predicate | hasTransportationCrossing |
P416
|
FINISHED |
| Object | Interstate 80 |
E8167
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 80 | Statement: [California–Nevada border, hasTransportationCrossing, Interstate 80]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 80 Context triple: [California–Nevada border, hasTransportationCrossing, Interstate 80]
-
A.
Interstate 80
chosen
Interstate 80 is a major transcontinental highway in the United States that runs from San Francisco, California, to Teaneck, New Jersey, serving as a key east–west transportation corridor.
-
B.
Interstate 5
Interstate 5 is a major north–south U.S. highway running along the West Coast from the Mexican border in California through Oregon and Washington to the Canadian border.
-
C.
Interstate 15
Interstate 15 is a major north–south U.S. highway running from Southern California through the Intermountain West to the Canadian border, serving key cities such as Las Vegas and Salt Lake City.
-
D.
Interstate 90
Interstate 90 is the longest Interstate Highway in the United States, running east–west from Seattle, Washington, to Boston, Massachusetts.
-
E.
U.S. Route 50
U.S. Route 50 is a major transcontinental U.S. highway running east–west across the country from the Atlantic coast in Maryland to California, passing through numerous states and key cities along the way.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasTransportationCrossing Context triple: [California–Nevada border, hasTransportationCrossing, Interstate 80]
-
A.
hasGroundTransportation
Indicates that an entity provides, includes, or is connected to transportation services or options that operate on land (e.g., cars, buses, trains).
-
B.
hasTransportationSystem
Indicates that an entity possesses, operates, or is served by an organized system for transporting people or goods.
-
C.
hasTransportHub
Indicates that a location contains or serves as a central facility where multiple transport routes or modes connect for passenger or cargo movement.
-
D.
crossedBy
chosen
Indicates that one entity (typically a path, line, or boundary) is intersected or traversed by another entity.
-
E.
hasFerryService
Indicates that there is an operational ferry connection or transport service available between the related locations or entities.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a24c06b3bc8190aa4ac89026115efc |
completed | Feb. 28, 2026, 1:59 a.m. |
| NER | Named-entity recognition | batch_69a24f6997c081908b202f937eb2b14f |
completed | Feb. 28, 2026, 2:14 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a3d7deca2c81908c4e4e13f7929877 |
completed | March 1, 2026, 6:08 a.m. |
| PD | Predicate disambiguation | batch_69a24eab7f408190a8275cb82474f575 |
completed | Feb. 28, 2026, 2:10 a.m. |
Created at: Feb. 28, 2026, 2:03 a.m.