Triple
T7139579
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Checkpoint Bravo |
E166406
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Cold War checkpoint |
C16404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Cold War checkpoint Context triple: [Checkpoint Bravo, instanceOf, Cold War checkpoint]
-
A.
Cold War military site
A Cold War military site is a strategically located facility, installation, or complex developed or used during the Cold War era for defense, surveillance, weapons deployment, command and control, or related military operations shaped by nuclear deterrence and superpower rivalry.
-
B.
section of the Berlin Wall
A section of the Berlin Wall is a preserved or reconstructed fragment of the former fortified barrier that once divided East and West Berlin, serving as a historical artifact and symbol of Cold War division and reunification.
-
C.
Berlin Airlift
The Berlin Airlift was a massive Allied operation from 1948 to 1949 in which Western powers supplied West Berlin entirely by air after the Soviet Union blockaded all ground routes into the city.
-
D.
Cold War military infrastructure
chosen
Cold War military infrastructure encompasses the global network of bases, missile silos, radar stations, command bunkers, communication systems, and logistical facilities built and maintained by rival blocs to support nuclear deterrence, rapid deployment, and continuous surveillance.
-
E.
Nazi death marches
Nazi death marches were forced evacuations of concentration camp prisoners on brutal, often lethal marches near the end of World War II, intended to prevent their liberation and conceal evidence of Nazi atrocities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6888579d481909e05a8d6b81bf733 |
completed | March 27, 2026, 1:39 p.m. |
Created at: March 27, 2026, 2:45 p.m.