Triple

T7130407
Position Surface form Disambiguated ID Type / Status
Subject Littleport railway station E166171 entity
Predicate onRailwayLine P848 FINISHED
Object Fen Line E31344 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fen Line | Statement: [Littleport railway station, onRailwayLine, Fen Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fen Line
Context triple: [Littleport railway station, onRailwayLine, Fen Line]
  • A. Fen Line chosen
    The Fen Line is a railway route in eastern England that runs north from Cambridge towards King’s Lynn, serving towns and communities across Cambridgeshire and Norfolk.
  • B. Warminster Line
    The Warminster Line is a commuter rail service in the Philadelphia region that connects Center City with suburban communities in and around Warminster, Pennsylvania.
  • C. Watercress Line
    The Watercress Line is a preserved heritage railway in Hampshire, England, known for its steam-hauled trains running through the countryside between Alton and Alresford.
  • D. Bannan line
    The Bannan line is a major east–west rapid transit route in the Taipei Metro system, connecting key commercial and residential districts across Taipei and New Taipei City.
  • E. Argyle Line
    The Argyle Line is a suburban railway route in the Glasgow area of Scotland, providing cross-city services that connect various towns and districts through central Glasgow.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6888350588190870cd552b427a1cd completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6e66dc2388190bdec018f1cc6b20a completed March 27, 2026, 8:19 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7a33eea0481909f87e0813bc35b52 completed March 28, 2026, 9:45 a.m.
Created at: March 27, 2026, 2:44 p.m.