Triple

T712635
Position Surface form Disambiguated ID Type / Status
Subject Google Chrome Canary E14242 entity
Predicate usesUpdateSystem P8459 FINISHED
Object Google automatic update system LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Google automatic update system | Statement: [Google Chrome Canary, usesUpdateSystem, Google automatic update system]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usesUpdateSystem
Context triple: [Google Chrome Canary, usesUpdateSystem, Google automatic update system]
  • A. isUpdated
    Indicates that an entity has been modified or brought to a more recent state compared to its previous version or a reference point.
  • B. usedBySystem chosen
    Indicates that something is utilized or operated by a particular system.
  • C. updated
    Indicates that an entity has been modified or brought to a more recent state compared to its previous version or status.
  • D. upgradeEligibility
    Indicates whether an entity qualifies to move from its current version, level, or plan to a higher or more advanced one under defined criteria.
  • E. upgradeProgram
    Indicates that one entity improves, enhances, or replaces another entity’s program with a more advanced or updated version.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4934a36e081909e7abef98b898a4e completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a77fcc6881908a025bb21e44ad56 completed March 1, 2026, 8:54 p.m.
PD Predicate disambiguation batch_69a4a4f221b081909fbaa689fb20eb3e completed March 1, 2026, 8:43 p.m.
Created at: March 1, 2026, 7:36 p.m.