Triple
T7104684
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cranleigh Show |
E165550
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | country fair |
C10162
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: country fair Context triple: [Cranleigh Show, instanceOf, country fair]
-
A.
fairground
A fairground is an outdoor venue equipped with rides, games, food stalls, and entertainment attractions, typically used for temporary fairs, carnivals, and community events.
-
B.
annual fair
An annual fair is a recurring, once-a-year public event featuring entertainment, exhibitions, vendors, and community activities, often celebrating local culture or traditions.
-
C.
folk festival
A folk festival is a community-centered event that celebrates traditional culture through music, dance, crafts, food, and rituals rooted in local or regional heritage.
-
D.
community festival
A community festival is a locally organized public event that brings residents together to celebrate shared culture, traditions, and interests through activities, performances, and social gatherings.
-
E.
agricultural show
chosen
An agricultural show is a public event where farmers, breeders, and producers exhibit livestock, crops, machinery, and rural crafts, often including competitions, demonstrations, and educational displays about agriculture.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6887fcddc8190a5d58908f6dee590 |
completed | March 27, 2026, 1:39 p.m. |
Created at: March 27, 2026, 2:42 p.m.