Triple

T708955
Position Surface form Disambiguated ID Type / Status
Subject Subhas Chandra Bose E14164 entity
Predicate instanceOf P0 FINISHED
Object Indian nationalist leader C1774 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Indian nationalist leader
Context triple: [Subhas Chandra Bose, instanceOf, Indian nationalist leader]
  • A. Indian nationalist chosen
    An Indian nationalist is an individual who strongly identifies with and advocates for the unity, sovereignty, cultural heritage, and political interests of India as a nation.
  • B. civic leader
    A civic leader is an individual who actively guides, organizes, and advocates within a community or public sphere to address collective needs, shape policy, and promote the common good.
  • C. guerrilla leader
    A guerrilla leader is a commander who organizes, directs, and motivates small, irregular combat groups to conduct unconventional warfare, often using hit-and-run tactics and local support against a typically stronger adversary.
  • D. Secretary of State for India
    The Secretary of State for India was the British Cabinet minister responsible for overseeing the administration, governance, and imperial policy of British India from 1858 to 1947.
  • E. event in the Indian independence movement
    An event in the Indian independence movement is a historically significant occurrence—such as a protest, law, campaign, negotiation, or act of resistance—that contributed to India’s struggle to end British colonial rule.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493494ec48190ae6751683625a9ba completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:36 p.m.