Triple
T7068090
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Equinix data centers |
E164613
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | colocation facility portfolio |
C16830
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: colocation facility portfolio Context triple: [Equinix data centers, instanceOf, colocation facility portfolio]
-
A.
data center
A data center is a specialized facility that houses networked computer systems, storage, and infrastructure to process, manage, and store large volumes of digital data.
-
B.
network operations facility
A network operations facility is a centralized, secure environment where personnel and systems monitor, manage, and maintain an organization’s communication networks and related infrastructure to ensure reliable, efficient, and secure operations.
-
C.
data center platform
A data center platform is an integrated environment of hardware, software, and management tools that provides scalable, secure, and reliable infrastructure for hosting, processing, and managing data and applications.
-
D.
library storage facility
A library storage facility is a specialized space designed to house, preserve, and organize less frequently used library materials in a secure, climate-controlled environment while keeping them retrievable on demand.
-
E.
business facility group
chosen
A business facility group is a collection of related physical or virtual business premises managed together for coordinated operations, services, or administration.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6887b96548190a8a9b3ac8adf4119 |
completed | March 27, 2026, 1:39 p.m. |
Created at: March 27, 2026, 2:39 p.m.