Triple
T704208
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Southern Company |
E14064
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electric utility holding company |
C359
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electric utility holding company Context triple: [Southern Company, instanceOf, electric utility holding company]
-
A.
electric utility
chosen
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
B.
natural gas utility
A natural gas utility is a regulated service provider that supplies, transports, and distributes natural gas to residential, commercial, and industrial customers through an integrated pipeline infrastructure.
-
C.
federally owned corporation
A federally owned corporation is a government-established legal entity that operates commercial or public service activities on behalf of the federal government while retaining a distinct corporate structure.
-
D.
energy ministry
The energy ministry is a government department responsible for formulating and implementing national policies, regulations, and strategies related to energy production, distribution, conservation, and security.
-
E.
infrastructure management company
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493494ec48190ae6751683625a9ba |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:36 p.m.