Triple

T704208
Position Surface form Disambiguated ID Type / Status
Subject Southern Company E14064 entity
Predicate instanceOf P0 FINISHED
Object electric utility holding company C359 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electric utility holding company
Context triple: [Southern Company, instanceOf, electric utility holding company]
  • A. electric utility chosen
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • B. natural gas utility
    A natural gas utility is a regulated service provider that supplies, transports, and distributes natural gas to residential, commercial, and industrial customers through an integrated pipeline infrastructure.
  • C. federally owned corporation
    A federally owned corporation is a government-established legal entity that operates commercial or public service activities on behalf of the federal government while retaining a distinct corporate structure.
  • D. energy ministry
    The energy ministry is a government department responsible for formulating and implementing national policies, regulations, and strategies related to energy production, distribution, conservation, and security.
  • E. infrastructure management company
    An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493494ec48190ae6751683625a9ba completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:36 p.m.