Triple

T7042007
Position Surface form Disambiguated ID Type / Status
Subject Pendik E163534 entity
Predicate hasRoadConnection P385 FINISHED
Object O-4 motorway E211318 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: O-4 motorway | Statement: [Pendik, hasRoadConnection, O-4 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: O-4 motorway
Context triple: [Pendik, hasRoadConnection, O-4 motorway]
  • A. O-4 motorway chosen
    The O-4 motorway is a major Turkish highway that runs across the Asian side of Istanbul, forming part of the main expressway connection between Istanbul and Ankara.
  • B. O-1 motorway
    The O-1 motorway is a major urban highway in Istanbul that forms part of the city’s inner ring road system and crosses the Bosporus via the Bosporus Bridge, linking the European and Asian sides.
  • C. O-3 motorway
    The O-3 motorway is a major Turkish highway in European Thrace that forms part of the main road connection between Istanbul and the western border with Europe.
  • D. R-4 motorway
    The R-4 motorway is a Spanish radial toll highway that provides an alternative route to the A-4 between Madrid and southern cities such as Valdemoro and Ocaña.
  • E. M-1 Motorway
    The M-1 Motorway is a major Pakistani expressway connecting Islamabad and Peshawar, serving as a key segment of the national and regional transport network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885e7c1c8190be32a8f79ab4e0cf completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6e23440e8819080963fe81cfa0695 completed March 27, 2026, 8:01 p.m.
NED1 Entity disambiguation (via context triple) batch_69d3549788608190a1949eb254e43a8e completed April 6, 2026, 6:37 a.m.
Created at: March 27, 2026, 2:36 p.m.