Triple

T703670
Position Surface form Disambiguated ID Type / Status
Subject Harland and Wolff E14053 entity
Predicate instanceOf P0 FINISHED
Object engineering company C426 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering company
Context triple: [Harland and Wolff, instanceOf, engineering company]
  • A. engineering firm chosen
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • B. engineering division
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • C. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • D. company
    A company is an organized entity, legally recognized or informally structured, that coordinates people and resources to produce goods or services for customers, typically in pursuit of profit or specific objectives.
  • E. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493494ec48190ae6751683625a9ba completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:36 p.m.