Triple

T702361
Position Surface form Disambiguated ID Type / Status
Subject Reorganization of the Indian Army during World War II E14026 entity
Predicate instanceOf P0 FINISHED
Object World War II–related event C873 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: World War II–related event
Context triple: [Reorganization of the Indian Army during World War II, instanceOf, World War II–related event]
  • A. World War II event chosen
    A World War II event is a historically significant occurrence between 1939 and 1945 that directly influenced the political, military, social, or economic course of the global conflict.
  • B. World War II site
    A World War II site is a historically significant location directly associated with events, operations, or impacts of the Second World War, preserved or recognized for its cultural, military, or memorial value.
  • C. World War II document
    A World War II document is an original or reproduced written, printed, or recorded artifact created during or directly concerning the events, policies, operations, or experiences of the Second World War.
  • D. World War II faction
    A World War II faction is a distinct political, military, or ideological group—such as a nation, alliance, or resistance movement—that organized and acted collectively to pursue its strategic objectives during the global conflict of 1939–1945.
  • E. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493494ec48190ae6751683625a9ba completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:36 p.m.