Triple

T7016009
Position Surface form Disambiguated ID Type / Status
Subject Kolkata Metro E162700 entity
Predicate hasDepot P2413 FINISHED
Object New Garia depot
New Garia depot is a major Kolkata Metro facility used for stabling, maintaining, and operating metro trains serving the southern part of the city.
E635150 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New Garia depot | Statement: [Kolkata Metro, hasDepot, New Garia depot]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New Garia depot
Context triple: [Kolkata Metro, hasDepot, New Garia depot]
  • A. Gyaspur Depot
    Gyaspur Depot is a major maintenance and stabling facility serving the Ahmedabad Metro system in Ahmedabad, India.
  • B. Wimco Nagar depot
    Wimco Nagar depot is a maintenance and stabling facility serving the northern stretch of the Chennai Metro network in Chennai, India.
  • C. Wadala Depot
    Wadala Depot is a key station and maintenance hub on the Mumbai Monorail network, serving the Wadala area of Mumbai, India.
  • D. Pontinha depot
    Pontinha depot is a maintenance and storage facility serving the Lisbon Metro system in Lisbon, Portugal.
  • E. Sharston depot
    Sharston depot is a bus operating and maintenance facility in the Sharston area of Manchester used by Stagecoach Manchester for its local services.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: New Garia depot
Triple: [Kolkata Metro, hasDepot, New Garia depot]
Generated description
New Garia depot is a major Kolkata Metro facility used for stabling, maintaining, and operating metro trains serving the southern part of the city.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: New Garia depot
Target entity description: New Garia depot is a major Kolkata Metro facility used for stabling, maintaining, and operating metro trains serving the southern part of the city.
  • A. Gyaspur Depot
    Gyaspur Depot is a major maintenance and stabling facility serving the Ahmedabad Metro system in Ahmedabad, India.
  • B. Wimco Nagar depot
    Wimco Nagar depot is a maintenance and stabling facility serving the northern stretch of the Chennai Metro network in Chennai, India.
  • C. Wadala Depot
    Wadala Depot is a key station and maintenance hub on the Mumbai Monorail network, serving the Wadala area of Mumbai, India.
  • D. Pontinha depot
    Pontinha depot is a maintenance and storage facility serving the Lisbon Metro system in Lisbon, Portugal.
  • E. Sharston depot
    Sharston depot is a bus operating and maintenance facility in the Sharston area of Manchester used by Stagecoach Manchester for its local services.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885a127c8190867b059bdccf13ff completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6e1d43e948190843f1cef3ce2004e completed March 27, 2026, 8 p.m.
NED1 Entity disambiguation (via context triple) batch_69c76a5655d48190a2df556f63add35d completed March 28, 2026, 5:42 a.m.
NEDg Description generation batch_69c76b9702d4819099f873b37fad309b completed March 28, 2026, 5:48 a.m.
NED2 Entity disambiguation (via description) batch_69c76c10303c8190a08f1728da6ebcd2 completed March 28, 2026, 5:50 a.m.
Created at: March 27, 2026, 2:34 p.m.