Triple

T700966
Position Surface form Disambiguated ID Type / Status
Subject Continuous Diagnostics and Mitigation tools E13997 entity
Predicate instanceOf P0 FINISHED
Object cybersecurity solution C227 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cybersecurity solution
Context triple: [Continuous Diagnostics and Mitigation tools, instanceOf, cybersecurity solution]
  • A. component of the Cybersecurity and Infrastructure Security Agency
    A component of the Cybersecurity and Infrastructure Security Agency is an organizational unit or program within CISA that carries out specific cybersecurity, infrastructure protection, emergency communications, or risk management functions in support of the agency’s mission.
  • B. network security protocol
    A network security protocol is a defined set of rules and procedures that protect data integrity, confidentiality, and authenticity during communication between devices over a network.
  • C. software engineering certification
    A software engineering certification is a formal credential that validates an individual's knowledge, skills, and competence in applying software engineering principles, practices, and tools to professional development projects.
  • D. software chosen
    Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
  • E. socio-technical system
    A socio-technical system is an interconnected arrangement of people, technologies, and organizational structures whose interactions jointly shape how work is performed and outcomes are produced.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493406c408190957eeec9048a8fb6 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:36 p.m.