Triple
T700966
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Continuous Diagnostics and Mitigation tools |
E13997
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cybersecurity solution |
C227
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cybersecurity solution Context triple: [Continuous Diagnostics and Mitigation tools, instanceOf, cybersecurity solution]
-
A.
component of the Cybersecurity and Infrastructure Security Agency
A component of the Cybersecurity and Infrastructure Security Agency is an organizational unit or program within CISA that carries out specific cybersecurity, infrastructure protection, emergency communications, or risk management functions in support of the agency’s mission.
-
B.
network security protocol
A network security protocol is a defined set of rules and procedures that protect data integrity, confidentiality, and authenticity during communication between devices over a network.
-
C.
software engineering certification
A software engineering certification is a formal credential that validates an individual's knowledge, skills, and competence in applying software engineering principles, practices, and tools to professional development projects.
-
D.
software
chosen
Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
-
E.
socio-technical system
A socio-technical system is an interconnected arrangement of people, technologies, and organizational structures whose interactions jointly shape how work is performed and outcomes are produced.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493406c408190957eeec9048a8fb6 |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:36 p.m.