Triple

T7006475
Position Surface form Disambiguated ID Type / Status
Subject Flaming Gorge Reservoir E162467 entity
Predicate partOfProject P10 FINISHED
Object Colorado River Storage Project E338654 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colorado River Storage Project | Statement: [Flaming Gorge Reservoir, partOfProject, Colorado River Storage Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Colorado River Storage Project
Context triple: [Flaming Gorge Reservoir, partOfProject, Colorado River Storage Project]
  • A. Colorado River Storage and Regulation System chosen
    The Colorado River Storage and Regulation System is a network of dams, reservoirs, and related infrastructure designed to manage, store, and control the flow of the Colorado River for water supply, flood control, and hydroelectric power generation.
  • B. Colorado-Big Thompson Project
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • C. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • D. Upper American River Project
    The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
  • E. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885928148190ae31909fbb5e9849 completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6dc35cb848190a839919021efce81 completed March 27, 2026, 7:36 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7755c7c1481908eed49c72726195e completed March 28, 2026, 6:29 a.m.
Created at: March 27, 2026, 2:33 p.m.