Triple

T6989593
Position Surface form Disambiguated ID Type / Status
Subject IGAD Centre for Pastoral Areas and Livestock Development E162050 entity
Predicate instanceOf P0 FINISHED
Object technical centre C2679 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: technical centre
Context triple: [IGAD Centre for Pastoral Areas and Livestock Development, instanceOf, technical centre]
  • A. technical commission
    A technical commission is a specialized group of experts formally appointed to study, evaluate, and provide recommendations on complex technical or scientific matters within a specific domain.
  • B. shared service centre
    A shared service centre is a centralized organizational unit that consolidates and delivers common support functions (such as finance, HR, or IT) to multiple business units to improve efficiency, standardization, and cost-effectiveness.
  • C. centre chosen
    A centre is a designated facility or focal point where specific activities, services, or operations are coordinated and provided.
  • D. technical specification area
    A technical specification area is a defined section within a system or document that outlines detailed technical requirements, standards, and constraints for a particular component, function, or domain.
  • E. technical code
    Technical code is a structured set of machine-readable instructions, written in a specific programming language, that implements precise computational logic and system behavior according to defined technical requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68856d7808190ab33ee914640281b completed March 27, 2026, 1:38 p.m.
Created at: March 27, 2026, 2:32 p.m.