Triple

T6967873
Position Surface form Disambiguated ID Type / Status
Subject Film City, Mumbai E161532 entity
Predicate instanceOf P0 FINISHED
Object film and television production complex C2563 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: film and television production complex
Context triple: [Film City, Mumbai, instanceOf, film and television production complex]
  • A. television studio complex
    A television studio complex is a purpose-built facility that houses multiple studios, control rooms, production offices, technical infrastructure, and support spaces for creating, recording, and broadcasting television content.
  • B. television production centre
    A television production centre is a facility equipped with studios, control rooms, and technical infrastructure where television programs are planned, recorded, edited, and broadcast.
  • C. entertainment complex
    An entertainment complex is a large, multi-purpose facility that combines various leisure, recreational, and cultural attractions—such as cinemas, theaters, restaurants, gaming areas, and event spaces—within a single integrated venue.
  • D. film studio chosen
    A film studio is a company or facility that finances, produces, and often distributes motion pictures and related media content.
  • E. movie studio backlot
    A movie studio backlot is a controlled outdoor area on a studio's property containing permanent or semi-permanent sets and streetscapes used to film a wide variety of scenes without leaving the studio.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68853cff881908439d488924a8283 completed March 27, 2026, 1:38 p.m.
Created at: March 27, 2026, 2:30 p.m.