Triple
T6967873
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Film City, Mumbai |
E161532
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | film and television production complex |
C2563
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: film and television production complex Context triple: [Film City, Mumbai, instanceOf, film and television production complex]
-
A.
television studio complex
A television studio complex is a purpose-built facility that houses multiple studios, control rooms, production offices, technical infrastructure, and support spaces for creating, recording, and broadcasting television content.
-
B.
television production centre
A television production centre is a facility equipped with studios, control rooms, and technical infrastructure where television programs are planned, recorded, edited, and broadcast.
-
C.
entertainment complex
An entertainment complex is a large, multi-purpose facility that combines various leisure, recreational, and cultural attractions—such as cinemas, theaters, restaurants, gaming areas, and event spaces—within a single integrated venue.
-
D.
film studio
chosen
A film studio is a company or facility that finances, produces, and often distributes motion pictures and related media content.
-
E.
movie studio backlot
A movie studio backlot is a controlled outdoor area on a studio's property containing permanent or semi-permanent sets and streetscapes used to film a wide variety of scenes without leaving the studio.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68853cff881908439d488924a8283 |
completed | March 27, 2026, 1:38 p.m. |
Created at: March 27, 2026, 2:30 p.m.