Triple

T6926378
Position Surface form Disambiguated ID Type / Status
Subject Pamlico Sound E160320 entity
Predicate inflow P415 FINISHED
Object Neuse River E63251 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Neuse River | Statement: [Pamlico Sound, inflow, Neuse River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Neuse River
Context triple: [Pamlico Sound, inflow, Neuse River]
  • A. Neuse River chosen
    The Neuse River is a major river in North Carolina that flows from the Piedmont through the Coastal Plain to empty into Pamlico Sound, playing a key role in the region’s ecology and history.
  • B. Lumber River
    The Lumber River is a blackwater river in southeastern North Carolina known for its scenic, swampy landscapes and designation as a National Wild and Scenic River.
  • C. Pamlico River
    The Pamlico River is a broad tidal estuary in eastern North Carolina that forms part of the Pamlico Sound system and is known for its coastal ecosystems, boating, and fishing.
  • D. Haw River
    Haw River is a central North Carolina river that flows through the Piedmont region and ultimately feeds into the Cape Fear River system.
  • E. Brunswick River
    The Brunswick River is a tidal river and estuary on the southeastern coast of Georgia that forms part of the waterfront and harbor area of the city of Brunswick.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6884d350081908d8a970e4d40ad78 completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6da1aa9c48190b63a04be2ed9e266 completed March 27, 2026, 7:27 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7bf709c4c819090c35eb41f46f5d2 completed March 28, 2026, 11:45 a.m.
Created at: March 27, 2026, 2:27 p.m.