Triple

T691793
Position Surface form Disambiguated ID Type / Status
Subject Protective Stadium E13807 entity
Predicate constructionStatus P1511 FINISHED
Object completed LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: completed | Statement: [Protective Stadium, constructionStatus, completed]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionStatus
Context triple: [Protective Stadium, constructionStatus, completed]
  • A. constructionCompleted chosen
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • B. constructionType
    Indicates the specific method or style by which something is built or constructed.
  • C. constructionResumed
    Indicates that previously halted construction activity on an entity or project has started again.
  • D. constructionSite
    Indicates that an entity is a location or area where construction work is actively taking place or is planned to occur.
  • E. reconstructionStatus
    Indicates the current state or phase of a reconstruction process that an entity is undergoing or has undergone.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493406c408190957eeec9048a8fb6 completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a0aebde88190a49d421477713103 completed March 1, 2026, 8:25 p.m.
PD Predicate disambiguation batch_69a49d221d38819083c0adda81f59b07 completed March 1, 2026, 8:10 p.m.
Created at: March 1, 2026, 7:36 p.m.