Triple

T6896525
Position Surface form Disambiguated ID Type / Status
Subject BART Antioch–SFO+Millbrae line E159382 entity
Predicate passesThrough P225 FINISHED
Object Transbay Tube E84112 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Transbay Tube | Statement: [BART Antioch–SFO+Millbrae line, passesThrough, Transbay Tube]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Transbay Tube
Context triple: [BART Antioch–SFO+Millbrae line, passesThrough, Transbay Tube]
  • A. Transbay Tube chosen
    The Transbay Tube is an underwater rail tunnel beneath San Francisco Bay that carries BART trains between San Francisco and Oakland.
  • B. Yerba Buena Tunnel
    Yerba Buena Tunnel is a vehicular tunnel in the San Francisco Bay that carries the San Francisco–Oakland Bay Bridge through Yerba Buena Island, connecting its eastern and western spans.
  • C. Alameda Corridor
    The Alameda Corridor is a 20-mile freight rail expressway in Los Angeles County that consolidates and streamlines cargo movement between the region’s ports and the national rail network.
  • D. Alaskan Way Viaduct
    The Alaskan Way Viaduct was an elevated highway along Seattle’s waterfront that carried a section of State Route 99 before being demolished due to seismic vulnerability and replaced by a tunnel.
  • E. Downtown Seattle Transit Tunnel
    The Downtown Seattle Transit Tunnel is a former dual-use bus and light rail tunnel running beneath central Seattle that served as a major rapid transit corridor through the city’s downtown.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6883822e0819091e321526f20ae0a completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6d95ae3f88190b7f5d440f90ae9f9 completed March 27, 2026, 7:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69c748dfd9608190891c8df48b771e20 completed March 28, 2026, 3:20 a.m.
Created at: March 27, 2026, 2:24 p.m.