Triple

T6896493
Position Surface form Disambiguated ID Type / Status
Subject BART Antioch–SFO+Millbrae line E159382 entity
Predicate instanceOf P0 FINISHED
Object Bay Area Rapid Transit line C640 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Bay Area Rapid Transit line
Context triple: [BART Antioch–SFO+Millbrae line, instanceOf, Bay Area Rapid Transit line]
  • A. former Los Angeles Metro Rail line
    A former Los Angeles Metro Rail line is a previously operated light rail or rapid transit route within the Los Angeles Metro Rail system that has since been discontinued, restructured, or replaced.
  • B. rapid transit line chosen
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • C. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • D. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • E. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6883822e0819091e321526f20ae0a completed March 27, 2026, 1:38 p.m.
Created at: March 27, 2026, 2:24 p.m.